Case Study – Power-Clean Building Cladding

Tankline was commissioned to deliver a cladding cleaning project using our Power-Clean system across multiple steel-framed buildings clad in corrugated, coated sheeting. Years of exposure had left the cladding stained with dirt and grime, significantly affecting the visual presentation of the site.All works were carried out on-site at the client’s facility, where access and safety […]
Case Study: Bund-Line Water Treatment Works, Hove

Tankline were called in to assess and install a new bund lining system at a water treatment facility in Hove. The bund in question housed an acid tank, so the specification needed to withstand a highly aggressive chemical environment. Our Solution Due to the concentration and corrosive nature of the acid stored, we selected an […]
Case Study – Bund Line CIP Bund -Derby

Tankline was commissioned to install our Epoxy-Line system to two new steel tanks built to US military specification. The project called for a high-performance lining system — Interline 984, applied in two coats at a total dry film thickness (DFT) of 600 microns. All works were carried out on the client’s premises, where we had […]
Case Study – School Pool using Pool-Line System

Tankline were contacted by a school in Hertfordshire with a leaking swimming pool liner. The existing bag-style liner had torn, prompting the school to seek a longer-lasting, more durable solution. We introduced the client to our Pool-Line system, highlighting key benefits such as: Seamless finish – no joints, no weak pointsTear-resistant – unlike traditional linersColour-fast […]
Case Study – Penguin Pool using Spray-Coat System

Tankline were commissioned to refurbish a penguin pool where a GRP lining system installed in 2015 had failed. The client required a robust, flexible, and long-lasting solution that could withstand frequent filling and emptying — a routine occurrence every two weeks. Our Chosen System: Spray-Coat We recommended our Spray-Coat system, a high-performance polyurea-based solution known […]
Case Study – School Pool using Pool-Line System

Tankline were contacted by a school in the Isle of Man after their swimming pool was forced to close due to a failed GRP liner. The previous contractor had applied GRP directly onto unprepared tiles, which resulted in complete delamination and a costly shutdown of the facility. The client, understandably frustrated by the poor workmanship, […]
Case Study – Flex-Line Drinking Water Tank Lining

Tankline was called in to remediate a drinking water tank serving a busy leisure centre. The tank had suffered significant osmosis, leading to blistering, delamination, and ultimately a failed Legionella test — making it a clear health and compliance concern.This type of failure is common in older tanks constructed with polyester-based GRP panels, where the […]