Case Study: Bund-Line Water Treatment Works, Hove

Completed bund lining

Tankline were called in to assess and install a new bund lining system at a water treatment facility in Hove. The bund in question housed an acid tank, so the specification needed to withstand a highly aggressive chemical environment. Our Solution Due to the concentration and corrosive nature of the acid stored, we selected an […]

Case Study – Bund Line CIP Bund -Derby

Bund line cip bund in derby

Tankline was commissioned to install our Epoxy-Line system to two new steel tanks built to US military specification. The project called for a high-performance lining system — Interline 984, applied in two coats at a total dry film thickness (DFT) of 600 microns. All works were carried out on the client’s premises, where we had […]