recent projects

Bundline

Vinyl Ester GRP Bund Lining Project at Chelmsford Hospital

Chemical-Resistant Bund-Line GRP System Installed Within Live Hospital Environment

Tankline recently completed the refurbishment and lining of an existing blockwork containment bund at a hospital facility in Chelmsford, Essex using the Tankline Bund-Line vinyl ester GRP lining system.

The project involved the installation of a fully reinforced chemical-resistant fibreglass lining system designed to provide long-term containment protection within a critical operational environment.

As specialist industrial bund lining contractors, Tankline provides chemical-resistant GRP lining systems for hospitals, industrial facilities, chemical storage areas, and process containment applications throughout the UK.

Scope of Works

The scope of works included:

  • Mechanical surface preparation by diamond grinding
  • Removal of dust and debris by industrial vacuum cleaning
  • Filling of concrete voids and surface defects
  • Application of vinyl ester resin primer
  • Installation of reinforced GRP laminate system
  • Final resin sealing coats to the completed lining system

Surface Preparation

Correct surface preparation is essential for the long-term performance of any industrial GRP bund lining system.

The existing blockwork bund was mechanically prepared using diamond grinding equipment to remove surface contamination, laitance, and weak material while creating a suitable mechanical key for the new lining system.

Bund Before
Bund lining before
Blockwork filled & levelled
Blockwork filled and levelled

Following preparation, all dust and debris were removed by industrial vacuum cleaning to ensure a clean and dry substrate prior to priming.

Concrete voids, surface defects, and imperfections within the substrate were repaired using a vinyl ester resin filler system to create a uniform and structurally sound surface for lamination.

Bund-Line Vinyl Ester GRP Lining Installation

Once preparation and repairs had been completed, the bund was resin primed using the Tankline Bund-Line vinyl ester system.

Bund Resin Primed
Resin primed Vinyl Esher system

The containment area was subsequently lined using a reinforced fibreglass laminate consisting of:

  • 2 layers of 450 g/m² chopped strand mat reinforcement
  • Fully impregnated using chemical-resistant vinyl ester resin
  • Consolidated to remove trapped air and ensure full laminate integrity

Following lamination, the completed GRP system was sealed and finished with two additional coats of vinyl ester resin to provide a seamless, durable, and chemically resistant finish.

Finished
Finished Bund Lining
Finsihed
Completed industrial bund lining

Why Vinyl Ester GRP Systems Are Used for Bund Lining

Vinyl ester GRP lining systems are widely used for industrial bund lining and secondary containment applications due to their excellent resistance to chemicals, moisture ingress, and substrate movement.

The Tankline Bund-Line system provides:

  • Excellent chemical resistance
  • Seamless waterproof protection
  • High mechanical strength
  • Long-term durability
  • Resistance to chemical attack and permeation
  • Easy-to-clean hygienic finish

These systems are commonly used within hospitals, chemical storage areas, manufacturing facilities, wastewater environments, and industrial process plants.

For more information on fibreglass laminate systems, see our article on fibreglass matting consolidation on concrete.

Challenges on Site

As the works were completed within a live hospital environment, careful planning and coordination were required throughout the project to minimise disruption while maintaining safe working practices.

Dust control measures and controlled working areas were maintained throughout the installation process to ensure the surrounding operational areas remained unaffected.

Completed Result

The completed Bund-Line vinyl ester GRP lining system provided the client with a seamless and chemically resistant secondary containment barrier suitable for long-term service within the hospital facility.

Tankline specialises in industrial bund lining, chemical-resistant GRP systems, vinyl ester linings, and protective coating applications throughout the UK.

View more Bund-Line case studies or contact Tankline via our contact page.

You may also be interested in these recent projects...

Contact our technical team today on 01206 670309 or email [email protected] to discuss the best lining solution for your facility.